What a home survey should include for renewable installations
Last updated: 28 October 2026. Reviewed by the Scottish Energy Efficiency team.
What should a home survey cover before a renewable quote?
A home survey should assess roof condition and load capacity, orientation and shading, existing electrical setup, heating system compatibility, loft and cavity insulation, and access for scaffolding. The surveyor should take measurements, photographs, and notes. If no one visits the property before quoting, the quote is a guess.
A home survey is the foundation of an accurate quotation. Without it, the installer is working from satellite images and assumptions, which means the price is provisional and the system design is unverified. A proper survey takes 60-90 minutes and covers every aspect of your property that affects the installation.
We install through MCS-certified partners, and every quotation we produce is based on a physical survey of the property. This is why our prices are fixed after survey, not "subject to" something unnamed.
How does the surveyor assess my roof for solar panels?
The surveyor should check roof orientation with a compass, measure the usable roof area, assess the roof structure (rafters, tiles, membrane), check for shading from chimneys, trees, and neighbouring buildings, and photograph the roof from multiple angles. They should also check the loft space for rafter condition and access.
Roof condition matters more than most people realise. Older roofs with brittle tiles, deteriorated membrane, or undersized rafters may need remedial work before panels can be installed. The surveyor should identify this and the quotation should include any necessary roof repairs.
Shading is the second most important factor. Even partial shading from a chimney or tree can significantly reduce output, especially with string inverter systems. The surveyor should use a shading analysis tool to measure the impact and recommend micro-inverters or optimisers if shading is significant.
What electrical checks should the survey include?
The surveyor should inspect your consumer unit, check the available capacity, verify the meter location, assess the routing for DC and AC cabling, and check earthing and bonding. If your consumer unit needs upgrading to accommodate the installation, that cost should appear in the quotation.
Older properties often have consumer units that are full or do not meet current regulations. If the installer needs to upgrade your consumer unit, that is an additional cost that should appear in the quotation, not as a surprise on installation day.
The surveyor should also check whether you have a single-phase or three-phase supply. Most homes are single-phase, which limits the size of inverter you can install without network operator approval. Three-phase properties have more flexibility. For more on this, see our solar quote guide.
What does a heat pump survey check that a solar survey does not?
A heat pump survey includes a room-by-room heat loss calculation, assessment of radiator sizes and types, inspection of the hot water cylinder, measurement of pipe runs, and assessment of the external unit location. It is more detailed than a solar survey because it affects your entire heating system.
The heat loss calculation is the most important part of a heat pump survey. The surveyor measures each room — dimensions, wall construction, window type and area, floor type, ceiling height — and calculates how much heat each room loses at the design outside temperature. This determines the required heat pump capacity and whether your radiators need upgrading.
Without this calculation, the heat pump may be undersized (your home will not reach temperature in winter) or oversized (you will pay for capacity you do not need). The quotation should include the full calculation, not just a summary. For more, see our heat pump quote guide.
Should the surveyor check insulation and ventilation?
Yes. For heat pumps, loft and cavity wall insulation significantly affect the heat loss calculation. For solar, loft insulation affects cabling routes. The surveyor should check loft insulation depth, cavity wall insulation if applicable, and ventilation in the loft space. Poor insulation increases running costs for heat pumps.
A heat pump in a poorly insulated home will cost more to run because the heat loss is higher. The surveyor should assess insulation as part of the heat loss calculation and recommend upgrades where needed. If your loft has less than 270mm of insulation, upgrading it before or alongside the heat pump installation will reduce running costs.
For solar installations, loft ventilation matters because inverters generate heat and need adequate airflow. If the inverter is loft-mounted, the surveyor should check ventilation and recommend additional vents if needed.
What happens after the survey?
After the survey, the installer should produce a fixed-price, itemised quotation based on what was found. The price should not change unless you request additional work. If the price increases significantly after the survey without explanation, that is a red flag. See our red flags guide for more.
The survey is the point at which a provisional quote becomes a fixed quote. The installer has seen the property, identified any issues, and should now give you a price that will not change. If the price increases after the survey, ask why. Legitimate reasons include unexpected roof repairs or consumer unit upgrades identified during the survey — and these should be itemised in the revised quotation.
For more on what to watch for, see our red flags guide or our FAQ page.
Frequently asked questions
How long does a home survey take?
A solar survey typically takes 45-60 minutes. A heat pump survey takes 90-120 minutes because it includes a room-by-room heat loss calculation. The surveyor should explain what they are checking and why. Ask questions during the survey.
Should I be present during the survey?
Yes. The surveyor may need access to your loft, internal walls, consumer unit, and heating system. Being present lets you ask questions and ensures the surveyor does not miss anything. If you cannot be present, arrange for someone you trust to be there.
Is a remote survey sufficient for a solar quotation?
A remote survey using satellite imagery can give a provisional estimate, but a physical survey is needed before a fixed price can be given. A quote based solely on remote survey should state that the price is provisional and subject to a physical survey.
Does the survey cost anything?
Some installers charge for a survey, others include it free. If there is a charge, it should be stated upfront. We do not charge for the initial survey because it is part of producing an accurate quotation.
What should I prepare before the surveyor arrives?
Ensure access to the loft, the consumer unit, and all rooms. Have your recent energy bills available so the surveyor can assess your consumption. Clear any obstructions around the external areas where equipment might be installed.
Interest-free credit up to £30,000, subject to status.
Get a Quote
Ready for a quotation you can actually read?
Fill in the form and we will build an itemised quote that answers all nine checklist questions. No obligation, no cold call.
Fill in the form and we will build an itemised quotation across solar, battery, EV charging, or heat pumps — one that answers all nine checklist questions. No obligation, no cold call, no pressure.
Interest-free credit up to £30,000, subject to status.