Itemised renewable energy quotation on a kitchen table

Most people cannot tell a good renewable quotation from a bad one. That is the actual problem.

Two quotations for the same house can differ by thousands and neither one explains why. Here is what to look for, line by line.

Illustration: atmospheric abstract of the Scottish landscape at dawn with rolling hills in silhouette and warm golden light
  • Scottish-based team
  • MCS-certified installation partners
  • Free, no-obligation quote

A good renewable quotation itemises every cost — scaffolding, bird proofing, the usable battery capacity, the inverter, the network application, and the guarantee. A bad one gives you a total price and a saving figure with no assumptions. If you cannot tell which one you are holding, the quotation is the problem, not the technology.

The Quotation Checklist

How do I check a renewable energy quotation?

Hold these nine questions against any quote from any installer. If it cannot answer all of them, it is a sales sheet, not a quotation.

This is not a checklist for our quotes. It is a checklist for any quote, from anybody, including ours. Print it. Take it to the survey. If a quotation cannot answer these questions, it is a sales sheet.

  1. 01

    Is scaffolding included or an extra?

    Some quotations include scaffolding in the headline price. Others add it later as a surcharge. If it is not explicitly listed as included, assume it is an extra and ask for the cost before you compare.

  2. 02

    Is bird proofing included or a retrofit?

    Birds nest under solar panels and cause damage. Bird proofing should be part of the original installation, not a retrofit you pay for later. If it is not listed, ask whether it is included.

  3. 03

    Is the USABLE battery capacity stated, not just the headline figure?

    A battery advertised as 10kWh may only deliver 8kWh of usable energy. The difference is the depth of discharge limit. A quotation that only states the headline figure makes the battery look larger than it is.

  4. 04

    Is the inverter sized to the array, and is it named?

    An undersized inverter clips your output on sunny days. An oversized one wastes money. The quotation should name the inverter and state its capacity relative to the array. If it does not, the system has not been engineered, only priced.

  5. 05

    Is the network operator application included and made for you?

    Every solar installation needs approval from the network operator — SP Energy Networks or SSEN depending on your postcode. The quotation should confirm this is handled for you. If you have to apply yourself, that is work the installer has not done.

  6. 06

    Is the guarantee insurance-backed, and does it survive the installer?

    A guarantee from the installer dies if the installer ceases trading. An insurance-backed guarantee survives because the insurer pays. Ask for the name of the insurer and the policy terms in writing.

  7. 07

    Who physically does the work, and is their name on the certificate?

    Some companies sell the job and subcontract the installation. The MCS certificate should carry the name of the company that did the work. If the name on the certificate differs from the company you are talking to, ask why.

  8. 08

    Is every saving shown with its assumptions, or just as one number?

    A saving figure without assumptions is a marketing number. A real quotation shows the orientation, shading, system size, tariff, and consumption pattern it was calculated from. If the assumptions are missing, the saving is not verifiable.

  9. 09

    Is the price fixed after survey, or is it subject to something unnamed?

    A quotation that says "subject to survey" may increase after you have committed time and attention. A fixed price after survey means the installer has done the engineering before quoting. If the price is conditional, ask what could change it and by how much.

If a quotation cannot answer nine questions, it is a sales sheet.

How does getting a renewable quote in Scotland work?

You send your details, we build an itemised quotation that answers the nine checklist questions, and you compare it against any other offer before deciding.

01

You send your details

Fill in the form with your postcode, monthly bill, and property type. It takes under two minutes. No account, no password, no obligation.

02

We build a quotation you can read

We produce an itemised quotation across solar, battery, EV charging, or heat pumps — one that answers all nine checklist questions. You see every line.

03

You compare it, then decide

Hold our quotation against any other. If ours answers the nine questions and the price is right, take it. If another quote does better, take that one. We would rather you bought well.

What is included in every quotation we produce?

Every quotation itemises scaffolding, bird proofing, usable battery capacity, the inverter, the network application, the guarantee, and savings with assumptions. Nothing is left as an extra or a surprise.

  • Itemised quotation across solar, battery, EV charging, and heat pumps
  • MCS-listed equipment, confirmed in writing on your quotation
  • Network operator application handled for you — SP Energy Networks or SSEN
  • Scaffolding and bird proofing included in the fixed price, not added later
  • Usable battery capacity stated alongside the headline figure
  • Inverter model and capacity named and sized to the array
  • Insurance-backed guarantee with insurer name and policy details
  • Savings shown with full assumptions — orientation, shading, tariff, consumption
  • Fixed price after survey, not subject to unnamed conditions
  • We install through MCS-certified partners

The Honest Disqualifier

Should you not bother?

If your existing quote answers all nine questions and the price is right, take it. We would rather you bought well than bought from us.

If you already hold a written quotation from an MCS-certified installer that answers all nine questions above and the price is right, take it. We would rather you bought well than bought from us.

This page exists because most quotations do not answer those questions. If yours does, you do not need us. If it does not, fill in the form and we will build one that does.

Fitted by MCS-certified partner installers
Fitted by MCS-certified partner installers
Every panel, inverter and battery itemised
Every panel, inverter and battery itemised
Batteries sited outside, never in the house
Batteries sited outside, never in the house

What five questions should I ask any installer?

Ask for the MCS number, TrustMark registration, whether the guarantee is insurance-backed, whether scaffolding is included, and who physically does the installation.

  1. 1

    What is your MCS certification number?

  2. 2

    Are you a TrustMark registered business?

  3. 3

    Is your guarantee insurance-backed, and does it survive if you cease trading?

  4. 4

    Is scaffolding included, or charged as an extra?

  5. 5

    Who actually carries out the installation, and are they the same company whose name is on the certificate?

FAQ

What do people ask about renewable quotes in Scotland?

The same questions people ask on the phone, written down so you can read them at your own pace.

The same questions people ask on the phone, written down so you can read them at your own pace.

A solar quotation must itemise scaffolding, bird proofing, the usable battery capacity not just the headline figure, the inverter model and size, the network operator application, and whether the guarantee is insurance-backed. If any of these are missing or listed as extras, the quote is incomplete.

A fair heat pump quotation states the SCOP (seasonal coefficient of performance) with its assumptions, names the manufacturer and model, includes the network operator application, and confirms who physically carries out the installation. If the saving is shown as one number without assumptions, ask why.

Scaffolding is sometimes included and sometimes charged as an extra. If a quotation does not explicitly state that scaffolding is included in the price, assume it is an extra and ask for the cost. A quote that hides scaffolding as a later add-on is not a fixed price.

Headline battery capacity is the total energy the battery holds. Usable capacity is what you can actually draw, typically 80 to 90 percent of the headline figure. A quotation that only states the headline number makes the battery look larger than it is. Always ask for the usable figure in writing.

In central and southern Scotland the network operator is SP Energy Networks. In the north, Highlands and Islands it is SSEN. Your postcode determines which one applies. The network operator application should be included in your quotation and made for you, not left for you to handle.

An insurance-backed guarantee means the guarantee survives even if the installation company ceases trading. Without it, the guarantee dies with the company. Always ask whether the guarantee is insurance-backed and ask for the name of the insurer and the policy details in writing.

Ask the installer for their MCS certification number and verify it on the MCS public register. The certification number should match the company whose name appears on the certificate and the company physically carrying out the work. If the name on the certificate differs from the company doing the install, ask why.

A quotation you can actually read

A quotation you can actually read

Itemised kit, honest savings and payback, and interest-free finance available. No pressure, no call centre.

Get my free itemised quoteCall 0141 230 0198

Guides

Learn to read any renewable quotation

Each guide walks through a specific technology or situation, line by line, so you know what to look for before you sign anything.

The honest comparison

What a good quotation looks like versus a bad one

This table shows what to look for and what to avoid. Print it and hold it against any quote you receive — ours included.

What to checkGood quoteBad quote
Panel brand and wattage listed
Inverter model and capacity named
Scaffolding cost shown as a line item
Bird proofing included or stated as extra
Usable battery capacity (not headline only)
Network operator application included
Guarantee stated as insurance-backed or not
Savings shown with stated assumptions
Fixed price after physical survey
Single total price with no breakdown
Saving shown as one number, no assumptions
Scaffolding not mentioned
Battery described by headline capacity only
Guarantee terms not in writing
"Subject to survey" with no detail on what could change
Pressure to sign on the day

Last updated: 28 October 2026. This table is based on the nine-point quotation checklist used across this site.

If you are still comparing installers side by side, our sister site helps you compare solar installers and their quotes across Scotland. For a sense of what a system might cost and how export payments stack up, this guide to solar costs, savings and export tariffs breaks down the numbers. And if you are based in the north-east, the Aberdeen solar installers directory lists local MCS-certified firms for that area.

Part of the Scottish Energy Efficiency network.

Get a Quote

Ready for a quotation you can actually read?

Fill in the form and we will build an itemised quote that answers all nine checklist questions. No obligation, no cold call.

Fill in the form and we will build an itemised quotation across solar, battery, EV charging, or heat pumps — one that answers all nine checklist questions. No obligation, no cold call, no pressure.

Interest-free credit up to £30,000, subject to status.