Business & farm renewable energy quotes in Scotland
Last updated: 28 October 2026. Reviewed by the Scottish Energy Efficiency team.
What should a commercial solar quotation include?
A commercial solar quotation must itemise the panel array, inverter, mounting system, grid connection application, and monitoring. It should state the projected generation, export income, and the assumptions behind every figure. A single total price with no breakdown is not a commercial quotation.
Commercial solar in Scotland ranges from rooftop arrays on warehouses and business units to ground-mounted systems on farmland. The quotation must show the system size in kWp, the expected annual generation in kWh, and the orientation and shading assumptions behind that figure.
For businesses, the quote should also address grid connection — which may require a formal application to SP Energy Networks or SSEN rather than simple notification — and any structural survey requirements for the roof. The monitoring system should be named, not just listed as "included".
We install through MCS-certified partners, and our commercial quotations itemise every component so you can compare like for like and present the quotation to your accountant or board.
Can farms benefit from solar and battery storage?
Yes. Farms typically have large roof areas on barns and sheds, high daytime electricity use for milking, ventilation, and processing, and land for ground-mounted arrays. Solar with battery storage can reduce imported electricity significantly. The quotation should size the system to your actual consumption.
Scottish farms are well suited to solar. Dairy farms use power intensively for milking and cooling, often at times when solar generation is high. Poultry and livestock farms use ventilation and heating. Arable farms have workshop and grain-drying loads. A properly sized solar array with battery storage can cover a meaningful share of that demand.
For ground-mounted systems, the quotation should include foundations, cabling to the point of connection, and any planning considerations. Most ground-mounted arrays over 9 square metres require planning permission in Scotland, unlike rooftop domestic systems which are usually permitted development.
The quote should also address whether a three-phase connection is needed and whether the existing supply can support the proposed system. This is a common cost that gets missed.
What should a holiday let consider before installing solar?
Holiday lets have intermittent occupancy, so generation often exceeds demand during vacant periods. A battery helps capture excess, and the quotation should show export income from the Smart Export Guarantee. It should also address whether the consumer unit and wiring need upgrading.
Holiday lets in rural Scotland are frequently off-gas, relying on electricity or oil for heating and hot water. Solar can reduce running costs, but the usage pattern is bursty — full occupancy with high demand, then vacant with no demand. A battery is usually essential to make solar viable in this context.
The quotation should show the expected self-consumption rate, the expected export income, and whether the existing consumer unit can accommodate the installation. Many older holiday lets have aging wiring that needs upgrading before solar can be safely connected.
Ask whether the monitoring system lets you check generation remotely — useful when the property is vacant and you want to confirm the system is working.
How does commercial battery storage differ from domestic?
Commercial battery systems are typically larger (15-100+ kWh), may use three-phase inverters, and often need a different connection agreement. The quotation must state usable capacity, chemistry, cycle life, and whether the system supports peak shaving or time-of-use arbitrage.
Commercial battery storage serves different purposes than domestic. Peak shaving reduces your maximum demand charge by discharging during peak periods. Time-of-use arbitrage charges the battery on cheap overnight tariffs and discharges during expensive daytime periods. The quotation should state which of these the system is designed for.
For farms and businesses on three-phase supplies, the battery and inverter must be three-phase compatible. The quotation should name the inverter and confirm it matches your supply. Ask whether the system can operate in island mode during a power cut — not all commercial systems can.
See also our battery quote checklist for the full list of what a battery quotation must include.
Do rural businesses need a different survey?
Yes. Rural properties often have older electrical supplies, single-phase connections with limited capacity, and longer cable runs. The survey should assess the supply capacity, the condition of the consumer unit, and whether a phase upgrade or new transformer is needed. These costs must appear in the quotation.
Rural Scottish properties frequently have single-phase supplies with limited spare capacity. A standard domestic inverter may trip repeatedly if the supply cannot handle the export. The survey should check the supply capacity with the network operator and state whether an upgrade is needed.
The survey should also assess cable runs — the distance from the proposed panel location to the consumer unit affects cost. Long runs may require thicker, more expensive cable. If the surveyor does not measure this, the quotation is not fixed.
See our guide on what a home survey should include for the full checklist, which applies equally to commercial properties.
Frequently asked questions
Is 0% VAT available for commercial solar installations?
0% VAT applies to qualifying domestic installations until 31 March 2027 (HMRC). Commercial installations may be subject to standard VAT. Ask your accountant about the Capital Allowances available for business renewable installations, which can offset the VAT. The quotation should state the VAT rate applied.
Can I get finance for a commercial renewable installation?
Interest-free credit up to £30,000, subject to status, is available. For larger commercial systems, the quotation should state what finance options are available. Some MCS-certified partners offer leasing or power purchase agreements. Compare the total cost of finance against the upfront price.
Do I need planning permission for commercial solar in Scotland?
Rooftop solar on commercial buildings is generally permitted development in Scotland, subject to size and visibility conditions. Ground-mounted arrays usually require planning permission. The quotation should state whether planning is needed and whether the application is included or an extra.
How long does a commercial solar installation take?
A typical commercial rooftop installation takes 3-10 days depending on system size and roof complexity. Ground-mounted systems take longer due to foundations and cabling. The quotation should state the expected timeline and whether business operations need to pause during installation.
Get a Quote
Ready for a quotation you can actually read?
Fill in the form and we will build an itemised quote that answers all nine checklist questions. No obligation, no cold call.
Fill in the form and we will build an itemised quotation across solar, battery, EV charging, or heat pumps — one that answers all nine checklist questions. No obligation, no cold call, no pressure.